Construction estimating & quantity takeoff · United States & Canadamike@quantivoraestimates.com
  1. Home
  2. Trades
  3. Structural & Miscellaneous Steel
CSI 05 · Structure

Structural & Miscellaneous Steel estimating & takeoffs

Structural members by shape and weight, deck, joists and connections, plus the miscellaneous metals scattered across architectural sheets.

Typical turnaround 2–4 business daysDelivered as Excel + marked-up PDFs

What we measure

ItemUnit
Beams, columns and braces by shapeLB / TON
Base plates, embeds and anchor boltsEA
Joists and joist girdersEA / LF
Metal deck by gaugeSF
Stairs, railings and laddersEA / LF
Lintels, bollards and miscellaneous metalsEA / LB

Scope gaps we look for

These are the items most often missed on structural & miscellaneous steel bids. Anything we can't resolve from the drawings goes on the assumptions list so you can clarify it before bid day.

  • Misc. metals shown only on architectural details
  • Deck closures, pour stops and edge angles
  • Galvanizing versus shop primer
  • Connection weight allowance

Related project experience

Institutional

Public library

Indiana

64 line itemsDivision 05

Need a structural & miscellaneous steel estimate for a bid?

Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.