Select-service hotel
Complete hotel estimate from sitework to furnishings, with finishes priced by specification tag and manufacturer.
Send your plans. You get measured quantities, priced line items and color-coded markups, organized by CSI division in an Excel file you can check, edit and submit.
| CSI | Division | Total | $/SF |
|---|---|---|---|
| 09 | Finishes | $154,573 | 47.93 |
| 06 | Wood, Plastics & Composites | $75,705 | 23.47 |
| 01 | General Requirements | $70,000 | 21.71 |
| 32 | Exterior Improvements | $63,794 | 19.78 |
| 03 | Concrete | $55,433 | 17.19 |
| 07 | Thermal & Moisture Protection | $47,501 | 14.73 |
| Suggested bid (all 14 divisions) | $849,457 | 263.40 |
Most contractors don't lose bids on price. They lose them because the takeoff didn't get done in time, or because a scope gap ate the margin after award. We fix both.
How we workSend the overflow to us and keep bidding. Trade estimates come back in 2–4 business days and full GC estimates in 2–3 business days.
Each quantity is color-coded on the plans with a legend total, so you can check any line in minutes instead of trusting a black box.
Items shown on another trade's sheets, missing schedules and conflicting details are listed as assumptions you can clarify before bid day.
Local material and labor pricing, your markups, and your template or cost codes if you have them.
From an early budget on schematic drawings to a bid-ready trade estimate the night before the deadline.
Full estimates priced line by line: material, labor, equipment and markups, organized by CSI division.
Learn moreMeasured quantities by trade and CSI division, every item traced back to the drawing it came from.
Learn moreA priced estimate for your trade only, with clarifications and exclusions ready for your proposal.
Learn moreEarly cost guidance from schematic or design-development drawings, with clear allowances and contingency.
Learn moreDocumented pricing for addenda, revisions and change orders, with adds and credits shown separately.
Learn moreA dedicated remote estimator working your bid list every month, in your format, without full-time payroll.
Learn more
Every trade page lists what we measure, the units we use and the scope gaps we look for.
Email the drawings with the trades and bid date.
Price and delivery date within 1 business day. Nothing starts until you approve.
Measured, priced and checked by a second estimator.
Excel, markups and exclusions in your inbox. Questions answered fast.
Client names are kept confidential. Projects are listed by building type and region.
Complete hotel estimate from sitework to furnishings, with finishes priced by specification tag and manufacturer.
Structural and miscellaneous steel: HSS columns, base plates, beams and connections from S-series sheets.
Priced electrical estimate with labor hours, supplier BOM, site lighting, trenching and written inclusions and exclusions.
Footings, slab on grade, beams and 27-ft reinforced CMU walls with block counts.
Concrete gravity wall with excavation, backfill, drainage pipe and gravel, revised for a re-issued drawing set.
Demolition, structure, envelope, finishes and MEP for a whole-house remodel with a kitchen and bath addition.
The plan set (PDF is fine), specifications if you have them, any addenda, the project location and your bid due date. Tell us which trades or divisions you need. If you are not sure, send everything and we will tell you what we need.
It depends on the size of the plan set, the number of trades and how much detail you need. You get a fixed price before we start. No hourly billing and no surprises.
Most single-trade estimates take 2–4 business days. Full GC estimates take 2–3 business days, depending on size. Rush delivery available for bid-day deadlines.
An Excel estimate with live formulas, color-coded marked-up PDF drawings, and a sheet of inclusions, exclusions and assumptions. Electrical estimates can also include a supplier bill of materials or an Accubid extension report.
Quantities are measured from the drawings and every estimate is checked by a second estimator before it is sent. Unit prices reflect the project's local market. Any assumption we had to make is written down, so you can see exactly what the number includes.
Yes. Plans are used only for your estimate and never shared.
Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.