Construction estimating & quantity takeoff · United States & Canadamike@quantivoraestimates.com
  1. Home
  2. Trades
  3. Concrete
CSI 03 · Structure

Concrete estimating & takeoffs

Footings, foundations, slabs, elevated decks and site concrete, taken off by element with reinforcing, formwork and accessories priced alongside the concrete.

Typical turnaround 2–4 business daysDelivered as Excel + marked-up PDFs

What we measure

ItemUnit
Continuous and isolated footingsCY
Foundation and retaining wallsCY / SFCA
Slab on grade, recessed and thickened slabsSF / CY
Elevated slabs, beams and columnsCY
Reinforcing steel by bar sizeLB
Welded wire mesh and vapor barrierSF
FormworkSF
Excavation, backfill and sub-baseCY

A page from a real takeoff

Color-coded concrete slab takeoff with quantities legend
Slab takeoff: each slab type, pad, footing and slab edge measured and color-coded, with totals in the legend.

Scope gaps we look for

These are the items most often missed on concrete bids. Anything we can't resolve from the drawings goes on the assumptions list so you can clarify it before bid day.

  • Thickened slab edges and turn-downs that only appear in details
  • Housekeeping pads shown on mechanical sheets
  • Dowels, laps and corner bars missing from the rebar schedule
  • Pier caps and grade beams on structural but not architectural plans
  • Over-excavation and pour waste

Related project experience

Institutional

Elementary school classroom addition

Central Florida

Division 03 / 32
Industrial

Wastewater pump station

Tampa, FL

937 SFRFI log
Commercial

Commercial storage building expansion

Tampa, FL

4,681 SF slab7,000+ SF CMU

Need a concrete estimate for a bid?

Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.