Electrical estimating & takeoffs

Every fixture counted by type tag, every device and panel, feeders from the riser, and site electrical. Delivered as a priced estimate, a bill of materials for supplier quotes, or an Accubid extension report.

Typical turnaround 2–4 business daysDelivered as Excel + marked-up PDFs

What we measure

ItemUnit
Light fixtures by type tagEA
Switches, receptacles and devicesEA
Panels, breakers and switchgearEA
Feeders and branch conduit and wireLF
Cable tray and wire basketLF
Fire alarm and low-voltage devicesEA
Site lighting, poles and trenchingEA / LF

A page from a real takeoff

Restaurant lighting plan with every fixture counted by type
Restaurant lighting plan: 40+ fixture types counted by tag, with wire measured in feet.

Scope gaps we look for

These are the items most often missed on electrical bids. Anything we can't resolve from the drawings goes on the assumptions list so you can clarify it before bid day.

  • Mechanical equipment connections
  • Feeder lengths from the riser diagram
  • Emergency and exit lighting circuits
  • Quoted packages such as fixtures, switchgear and fire alarm, kept separate

Related project experience

Industrial

Food manufacturing plant

Southern Ontario

DistributionCable tray
Industrial

Postal delivery centre

Toronto, ON

290+ line itemsAddendum pricing
Industrial

Industrial building addition

York Region, ON

Supplier-ready BOM

Need an electrical estimate for a bid?