Construction estimating & quantity takeoff · United States & Canadamike@quantivoraestimates.com
  1. Home
  2. Services
  3. Construction Cost Estimating
Construction Cost Estimating

Complete cost estimates, priced line by line

A full estimate that carries every measured quantity through to material, labor, equipment and markup. It is organized by CSI division so you can check it, adjust it and bid it with confidence.

Turnaround 2–3 business daysPricing Fixed quote before we start

Who it's for

  • General contractors bidding hard-bid or negotiated work
  • Developers and owners checking a budget or a contractor's number
  • Builders who want an independent second number before committing

What's included

  • Quantity takeoff for every division in scope
  • Material pricing at current local rates
  • Labor from unit man-hours and local wage rates
  • Equipment, general requirements and general conditions
  • Subcontracted scopes priced line by line or carried as labeled allowances
  • Overhead, profit, insurance, contingency and tax as editable markups

What you receive

  • Excel estimate with live formulas
  • Summary by CSI division with cost per square foot
  • Detailed takeoff with drawing references on every line
  • Color-coded, marked-up PDF drawings
  • Inclusions, exclusions and assumptions sheet

See one before you order

Commercial GC EstimateSingle-story transitional care center · 139 line items · live formulas
Download

Common questions

How accurate are your estimates?

Quantities are measured from the drawings, not assumed, and every estimate is checked by a second estimator before delivery. Pricing reflects current local material and labor rates. Where the drawings leave something open, the assumption is written on the assumptions sheet so nothing is hidden in the total.

Can I change the unit prices and markups?

Yes. The Excel file keeps live formulas. Change a unit price, waste factor or markup percentage and every total recalculates.

Do you price the subcontracted trades too?

Yes. Trades shown on the drawings are taken off and priced line by line. When a scope is not drawn in enough detail, which is common for MEP on early sets, we carry a clearly labeled allowance based on area or fixture counts.

Send your plans. Get a fixed quote within one business day.

Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.