Construction estimating & quantity takeoff · United States & Canadamike@quantivoraestimates.com
  1. Home
  2. Trades
  3. Fire Protection
CSI 21 · MEP

Fire Protection estimating & takeoffs

Sprinkler heads, piping by size, risers and valves for wet and dry systems.

Typical turnaround 2–4 business daysDelivered as Excel + marked-up PDFs

What we measure

ItemUnit
Sprinkler heads by typeEA
Sprinkler piping by sizeLF
Risers, valves and FDCEA
Standpipes and hose valvesEA

Scope gaps we look for

These are the items most often missed on fire protection bids. Anything we can't resolve from the drawings goes on the assumptions list so you can clarify it before bid day.

  • Dry systems at canopies and unheated areas
  • Hazard classification and design density
  • Fire pump and backflow scope

Related project experience

Hospitality

Select-service hotel

Dallas–Fort Worth, TX

2,454 line items16 CSI divisions
Hospitality

Boutique hotel improvements

San Francisco Bay Area, CA

76 line items11 CSI divisions
Institutional

Transitional care center

Northeast Florida

3,225 SF139 line items

Need a fire protection estimate for a bid?

Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.