Construction estimating & quantity takeoff · United States & Canadamike@quantivoraestimates.com
  1. Home
  2. Trades
  3. Roofing
CSI 07 · Envelope

Roofing estimating & takeoffs

Roof areas by slope and system, with insulation, flashing, edge metal and penetrations measured from plans, elevations and details.

Typical turnaround 2–4 business daysDelivered as Excel + marked-up PDFs

What we measure

ItemUnit
Roof area by slopeSF / SQ
Shingle, membrane or metal roofingSF
Underlayment and ice & water shieldSF
Roof insulation and cover board, including taperedSF
Ridge, hip, valley and wall flashingLF
Fascia, soffit, gutters and downspoutsLF
Curbs, drains and penetrationsEA

Scope gaps we look for

These are the items most often missed on roofing bids. Anything we can't resolve from the drawings goes on the assumptions list so you can clarify it before bid day.

  • Tapered insulation crickets
  • Parapet flashing height
  • Tear-off of existing layers
  • Walkway pads and warranty requirements

Related project experience

Hospitality

Select-service hotel

Dallas–Fort Worth, TX

2,454 line items16 CSI divisions
Hospitality

Boutique hotel improvements

San Francisco Bay Area, CA

76 line items11 CSI divisions
Institutional

Transitional care center

Northeast Florida

3,225 SF139 line items

Need a roofing estimate for a bid?

Tell us the trades and the bid date. We'll review the drawings and come back with a price and a delivery date before any work starts.